Steps to upgrade BEMS and change to an alternate JRE
BEMS
and change to an alternate JRE
Perform the following steps to upgrade
BEMS
and change from Oracle
JRE
to an alternate JRE
(for example, Azul Systems
or Zulu
). For more information, see 57053. Consider the following before you upgrade the
BEMS
instance:
- TheBEMSinstance must be fully functional, and theGood Technology Common Servicesservice must be running to perform an in-place upgrade of theBEMSsoftware.
- Before you upgrade, verify that theBEMSdebug logging level is not set to DEBUG or TRACE, or the upgrade or repair of theBEMSinstance fails. For more information, see 42408.
When you upgrade to
JRE
17, it is a best practice to uninstall JRE
8 after the upgrade is complete, to allow for potential rollback if necessary. If you have multiple
BEMS
instances in your environment, repeat these steps on each instance.Step | Action |
---|---|
Download and install a supported OpenJDK. | |
Import any custom certificates into the new lib\security\cacerts keystore. For instructions, see "Importing CA certificates for BEMS" in the Configuring BEMS-Core content. | |
Optionally, uninstall JRE 8. |