Steps to upgrade BEMS and change to an alternate JRE
    BEMS
 and change to an alternate JRE
Perform the following steps to upgrade 
BEMS
 and change from Oracle
 JRE
 to an alternate JRE
 (for example, Azul Systems
 or Zulu
). For more information, see 57053.  Consider the following before you upgrade the 
BEMS
 instance:
      - TheBEMSinstance must be fully functional, and theGood Technology Common Servicesservice must be running to perform an in-place upgrade of theBEMSsoftware.
- Before you upgrade, verify that theBEMSdebug logging level is not set to DEBUG or TRACE, or the upgrade or repair of theBEMSinstance fails. For more information, see 42408.
When you upgrade to 
JRE
 17, it is a best practice to uninstall JRE
 8 after the upgrade is complete, to allow for potential rollback if necessary. If you have multiple 
BEMS
 instances in your environment, repeat these steps on each instance.| Step | Action | 
|---|---|
|  | Download and install a supported OpenJDK. | 
|  | Import any custom certificates into the new lib\security\cacerts keystore. For instructions, see "Importing CA certificates for BEMS" in the Configuring BEMS-Core content. | 
|  | Optionally, uninstall  JRE8. | 

